Force Majeure  09/03/2008 15:52 

Effective:
09/03/2008 16:00

End: 
09/03/2008 17:00

Subject:
Chandeleur Pipe Line Update...... Chandeleur Pipe Line has completed its assessment of the pipe line and has determined that gas flow can resume on the system. The Force Majeure period is terminated upon posting of this notice. Chandeleur Pipe Line will accept nominations for the ID-2 cycle for 9/3/2008. Per Chandeleur's Tariff, ID-2 nominations must be submitted by 5:00 PM CCT and are effective 9:00 PM CCT.

Response:
None

Contact:
Lisa Conian Customer Service Rep 713-432-2653 713-294-1665

Force Majeure  09/02/2008 10:27 

Effective:
09/02/2008 09:00

End: 
None

Subject:
** Revision: Chandeleur Pipe Line Force Majeure Update Later today, Chandeleur Pipe Line field personnel will begin to assess the pipeline for damage and safety concerns resulting from the effects of Hurricane Gustav. Pursuant to Section 6.3 of the General Terms and Conditions of Chandeleur's FERC Gas Tariff, Chandeleur's Force Majeure notice will remain in effect until furter notice. Please continue to monitor the website for updates.

Response:
** Revision: None

Contact:
Lisa Conian Customer Service Rep 713-432-2653 713-294-1665

Force Majeure  09/02/2008 09:00 

Effective:
08/31/2008 12:00

End: 
09/01/2008 09:00

Subject:
** Revision: HURRICANE GUSTAV Update: Force Majeure. As of 8/31/2008 10:00 am, all production on Chandeleur Pipe Line has been shut in due to the events surrounding Hurricane Gustav. Chandeleur Pipe Line will not be accepting any nominations until further notice. Nominations for 8/31 have been reduced to EPSQ quantities and taken to Zero effective 9/01. Please continue to monitor Chandeleur's website for up to date Hurricane Gustav information.

Response:
** Revision: None

Contact:
Lisa Conian Customer Service Rep. 713-294-1665 cell

Force Majeure  09/02/2008 08:38 

Effective:
09/02/2008 09:00

End: 
None

Subject:
Chandeleur Pipe Line Force Majeure Update Later today, Chandeleur Pipe Line field personnel will begin to assess the pipeline for damage and safety concerns resulting from the effects of Hurricane Gustav. Pursuant to Section 6.3 of the General Terms and Conditions of Chandeleur's FERC Gas Tariff, Chandeleur's Force Majeure notice will remain in effect until furter notice. Please continue to monitor the website for updates.

Response:
None

Contact:
Lisa Conian Customer Service Rep 713-432-2653 713-294-1665

Force Majeure  08/31/2008 12:29 

Effective:
08/31/2008 12:00

End: 
09/01/2008 09:00

Subject:
HURRICANE GUSTAV Update: Force Majeure. As of 8/30/2008 10:00 am, all production on Chandeleur Pipe Line has been shut in due to the events surrounding Hurricane Gustav. Chandeleur Pipe Line will not be accepting any nominations until further notice. Nominations for 8/30 have been reduced to EPSQ quantities and taken to Zero effective 8/31. Please continue to monitor Chandeleur's website for up to date Hurricane Gustav information.

Response:
None

Contact:
Lisa Conian Customer Service Rep. 713-294-1665 cell

Other  08/30/2008 14:07 

Effective:
08/30/2008 15:00

End: 
08/30/2008 15:30

Subject:
HURRICANE GUSTAV UPDATE - Weather forecasts as of 8/30 indicate that Hurricane Gustav will not affect the operating area of Chandeleur Pipe Line, therefore service will not be interrupted. Chandeleur will continue to monitor the storm and will update shippers as to any changes in the storm's path.

Response:
None

Contact:
Lisa Conian Customer Service Rep. 713-294-1665 cell 713-432-2653 office

Other  08/29/2008 10:58 

Effective:
08/29/2008 12:00

End: 
08/29/2008 12:00

Subject:
HURRICANE GUSTAV UPDATE Chandeleur Pipe Line #832568243 Current weather forecasts are predicting that Hurricane Gustav will make landfall somewhere along the Gulf Coast early next week. Current forecast indicates Gustav will be a major storm and could likely make landfall somewhere in Chandeleur's operating area. Based upon this information all production could be shut in as early as Saturday. Chandeleur Pipe Line will continue to monitor receipts into the system and will notify shippers as production is shut in. We encourage all shippers to maintain contact with their suppliers to facilitate operations. Chandeleur Pipe Line's top priorities are the safety of its employees and the public and protecting the enviorment. Thank you in advance for your cooperation during this abnormal weather event.

Response:
NONE

Contact:
Lisa Conian Customer Service Rep. 713-432-2653 office 713-294-1665 cell

Capacity Constraint  03/12/2008 10:59 

Effective:
03/12/2008 12:00

End: 
03/17/2008 12:00

Subject:
Destin Delivery Capacity Constraint, Chandeleur Pipe Line #832468243 ................................................ Due to Plant maintenance on Destin Pipe Line, line pressure has increased causing deliveries to Destin to be constrained at this time. Deliveries will be made on a best efforts basis. Maintenance on Destin should be completed by 03/17/2008 09:00.

Response:
None

Contact:
Lisa Conian Customer Service Rep 713-432-2653 713-294-1665 cell

Other  01/24/2008 08:01 

Effective:
01/23/2008 11:00

End: 
None

Subject:
WEBSITE OUTAGE 01/19/2008 - 01/23/2008. Chandeleur Pipe Line #832468243................ Chandeleur Pipe Line experienced unforseen downtime on their IT infrastructure which caused their website to be unavailable. Shippers were notified by email and all transportation services were continued without interruption. As of 01/23/2008 11:00 complete service was restored.

Response:
None

Contact:
If you have any questions please call your customer service rep. Lisa Conian 713-432-2653.

Other  02/16/2007 08:50 

Effective:
03/03/2007 17:00

End: 
03/03/2007 21:00

Subject:
** Revision: Critical Notice 2007/03/03, Chandeleur Pipe Line Company, Duns #832468243 In an effort to provide you greater support and service, we will be performing a system and data update to Chandeleur's Website. The maintenance is scheduled for March 3rd and while it is not anticipated that there will be any disruption to utilization of the Website, as a result, Lisa Conian should be contacted should any problems be experienced. Cell Phone #713-294-1665

Response:
** Revision: No Response needed.

Contact:
Lisa Conian Customer Service Rep 713-432-2653 Office 713-294-1665 Cell

Other  02/15/2007 09:55 

Effective:
03/03/2007 17:00

End: 
03/03/2007 21:00

Subject:
The Chandeleur database server is scheduled for maintenance on March 3rd and while it is not anticipated that there will be any disruption to utilization of the Website, as a result, Lisa Conian should be contacted should should any problems be experienced. Cell Phone#713-294-1665

Response:
No Response needed.

Contact:
Lisa Conian Customer Service Rep 713-432-2653 Office 713-294-1665 Cell

Other  10/24/2006 10:58 

Effective:
10/24/2006 12:00

End: 
None

Subject:
In compliance with the Second Revised Volume #1, Sheet#52 Section 8.4 (b) (4) of the Chandeleur Ferc Tariff, Chandeleur will be notifying shippers of imbalances incurred on its pipeline and will be cashing out imbalances accordingly. Expect a detailed statement showing imbalances within the next 30 days.

Response:
No response needed

Contact:
Lisa Conian Customer Service Representative 713-432-2653 lisa.conian@chevron.com

Other  06/26/2006 09:02 

Effective:
06/26/2006 09:02

End: 
None

Subject:
Chandeleur Pipeline would like to remind all Shippers that they have the ability to trade with other Shippers imbalances that arise under their respective transportation contracts with Chandeleur. To do so, a Shiper must authorize, by email or fax, to Chandeleur to post that Shipper's imbalances for trading on Chandeleur's website. For procedures and information regarding the posting of imbalances for trading, please refer to First Revised Sheet No. 52B, Section 8.4(c)of Chandeleur's FERC Gas Tariff or contact your Customer Service Representative at Chandeleur Pipeline.

Response:
None

Contact:
Lisa Conian Customer Service Representative 713-432-2653 lisa.conian@chevron.com

Capacity Constraint  05/24/2006 09:36 

Effective:
05/25/2006 09:00

End: 
None

Subject:
Capacity constraints at delivery point #387992 Transco at Coden will be lifted effective for timely cylce for 5/25/2006. Chandeleur Pipeline will continue to monitor the situation for any new developments.

Response:
None

Contact:
Lisa Conian 713-432-2653 lisa.conian@chevron.com

Capacity Constraint  05/23/2006 10:54 

Effective:
05/23/2006 10:00

End: 
None

Subject:
Capacity Constraints at delievery meter #387992 Transco at Coden will continue to be allocated until further notice.

Response:
Please continue to monitor the Chandeleur bulletin board for updated information.

Contact:
Lisa Conian (Customer Service Rep.) Chandeleur Pipeline (713)-432-2653. or lisa.conian@chevron.com

Capacity Constraint  05/22/2006 14:36 

Effective:
05/23/2006 09:00

End: 
05/24/2006 09:00

Subject:
Due to capacity constraints at delivery point DRN #387992 Transco at Coden, Chandeleur Pipeline will be allocating capacity effective 5/23/2006 accordingly.

Response:
None

Contact:
Please contact Lisa Conian at 713-432-2653 for any questions regarding the cuts.

Force Majeure  05/18/2006 14:35 

Effective:
05/18/2006 12:00

End: 
None

Subject:
The anomaly that was identified in the 3/2/2006 posting has been repaired. MP41-L (DRN#32397) is no longer restricted to the Tetco delivery point. Chandeleur Pipeline will be accepting intraday nomination changes effective 5/18/2006.

Response:
No response needed.

Contact:
If you have any questions please contact Lisa Conian at 713-432-2653. lisa.conian@chevron.com

Other  05/18/2006 08:45 

Effective:
05/19/2006 18:00

End: 
05/19/2006 20:00

Subject:
Portions of the Chandeleur Pipeline website may be temporarily unavailabe on Friday, May 19th between 6 and 8 PM as the systems that support Chandeleur's business processes undergo planned maintenance. Website functions potentially affected include, but are not necessarily limited to the following navigational menu items: Informational Postings: Capacity, Operationally Available Capacity, Gas Quality, Non-discrimination Requirements, Emergency Deviations, Transactional Data, Firm, Interruptible. Should you require information supplied by any of these items during this outage, please contact Chandeleur's customer service representative via telephone at (713)-294-1665.

Response:
No response necessary

Contact:
If you have any questions please contact Lisa Conian at 713-432-2653.

Force Majeure  03/02/2006 14:07 

Effective:
03/01/2006 14:00

End: 
None

Subject:
An anomaly has been identified on Chandeleur's pipeline. At this time a team of engineers and pipeline specialists are evaluating the situation and repair time. MP41-L (DRN#32397) is restricted to flowing to the TETCO delivery point only and MP41-B is restricted to flowing to Chandeleur Pipeline only. When additional information becomes available a new posting will be made with repair times.

Response:
No Response Necessary

Contact:
If you have any questions please call Lisa Conian 713-432-2653 or email at lisa.conian@chevron.com

Force Majeure  01/16/2006 14:36 

Effective:
01/18/2006 09:00

End: 
None

Subject:
The anomaly has been repaired on the 16" main line pipeline and has been returned to normal service. Force Majeure conditions have been lifted as of 1/18/2006 9:00 A.M. Shippers are now able to schedule gas to all delivery points. Pipeline pressure has been returned to normal MOP.

Response:
Shippers should monitor the Website for additional information.

Contact:
Lisa Conian 281 596 2833 for after hours and emergencies call 713 294 1665.

Other  12/09/2005 14:11 

Effective:
12/04/2005 09:00

End: 
None

Subject:
Chandeleur Pipe Line Repair Status Update: As previously reported, due to the anomaly discovered on the 16" mainline pipeline during repairs, as a precautionary measure, Chandeleur will continue to operate the 16" at reduced pressure. It is still currently anticipated that the 16" pipeline will be brought back to normal operating conditions in early 2006. Until the 16" mainline resumes normal operating conditions, the following production points tied to the 16" mainline will be restricted to deliveries only to the Gulf South Pascagoula delivery point (DRN 12327) until the 16" pipeline can be returned to its normal operating pressure. Displacement deliveries to otherwise inaccessible delivery locations will be accomplished to the extent volumes are available. DRN 80823 - Mobile 990 DRN 441856 - Chandeleur Area 3 DRN 134539 - Chandeleur Sound 32 DRN 377741 - Chandeleur Sound 35 Shippers on the 12" mainline and lateral pipelines will be unable to deliver to Gulf South Pascagoula. However, displacement deliveries between the isolated 12" and 16" lines at Gulf South Pascagoula on behalf of shippers will be accomplished to the extent volumes are available. All delivery points other than Gulf South Pascagoula on Chandeleur's system will be available for the following producers on the 12" mainline and 12" lateral: DRN 32397 - Main Pass 41-L DRN 184404 - Main Pass 41-B DRN 134553 - Mobile 904-A DRN 80825 - Mobile 908-A DRN 387989 - Mobile 952 DRN 387994 - Mississippi Sound 73

Response:
If they have not already done so, interconnecting point operators on the 16" mainline should contact Chandeleur gas control at (281) 596-2810 to ensure non-interruption during the pressure reduction on the 16" pipeline. Shippers are advised to stay in contact with their production facilities and downstream parties in order to balance receipts with scheduled deliveries on the 16" mainline until repairs are completed and normal operating pressure can be resumed

Contact:
Please contact Lisa Conian or Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Force Majeure  12/09/2005 14:04 

Effective:
12/04/2005 09:00

End: 
None

Subject:
Chandeleur Pipe Line Repair Status Update -Force Majeure: The Chandeleur 12" mainline and MO902-MO861 12" lateral have been returned to normal service and force majeure conditions have been lifted as of December 4, 2005. However, due to an anomaly discovered on the 16" mainline pipeline, the 16" will continue to operate at reduced pressure, and all parties are reminded of the restrictions as previously reported on November 17, 2005. (Also see Critical Other separate notice regarding these restrictions.)

Response:
Shippers should monitor the website for additional information and are encouraged to reference Critical Other notices for future updates related to the 16" pipeline.

Contact:
Please contact Lisa Conian or Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Other  11/17/2005 13:43 

Effective:
11/17/2005 13:43

End: 
None

Subject:
Chandeleur Pipe Line Repair Status Update: All repairs on the 12" mainline pipeline have been completed. Low pressure testing to confirm the integrity of the pipeline repairs is currently in process and dewatering activities will commence as soon as the integrity of the repairs is confirmed. It is currently anticipated that the 12" mainline and MO902-MO861 12" lateral will resume operations the week of November 21; however, due to the anomaly discovered on the 16" mainline pipeline during repairs, the 16" will continue to operate at reduced pressure as previously reported. Materials have been ordered for the repairs to the 16" and it is currently anticipated that the 16" pipeline will be brought back to normal operating conditions in early 2006. Because of the repairs required to bring the 16" mainline back to normal operating conditions, the following production points tied to the 16" mainline will be restricted to the Gulf South Pascagoula delivery point until the 16" pipeline can be returned to its normal operating pressure: DRN 80823 - Mobile 990-A DRN 441856 - Chandeleur Area 3 DRN 134539 - Chandeleur Sound 32 DRN 377741 - Chandeleur Sound 35 Shippers on the 12" mainline and lateral pipelines will be unable to deliver to Gulf South Pascagoula. However, displacement deliveries between the isolated 12" and 16" lines at Gulf South Pascagoula on behalf of shippers will be accomplished to the extent volumes are available. All delivery points other than Gulf South Pascagoula on Chandeleur's system will be available for the following producers on the 12" mainline and 12" lateral: DRN 32397 - Main Pass 41-L DRN 184404 - Main Pass 41-B DRN 134553 - Mobile 904-A DRN 80825 - Mobile 908-A DRN 387989 - Mobile 952 DRN 387994 - Mississippi Sound 73

Response:
Shippers should monitor the website for additional information and be prepared to tender nominations once the pipeline has been returned to service. Nominations will be processed, volumes confirmed and flows scheduled in accordance with the applicable provisions of Chandeleur's tariff. Shippers are advised to stay in contact with their production facilities and downstream parties in order to balance receipts with scheduled deliveries once normal operations are resumed.

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Other  11/10/2005 15:27 

Effective:
11/10/2005 15:27

End: 
None

Subject:
Chandeleur 12" Mainline Repair Update Status: Repairs are completed on the Chandeleur 12" mainline in the vicinity of Chandeleur Area 7. However, Chandeleur identified a need for additional repairs in a separate area of the 12" mainline in the vicinity of Breton Sound 26. Replacement pipe is on location and necessary work is currently under way. The additional repair work is anticipated to be complete next week. Consequently, dewatering of the entire 12" mainline and 12" lateral eastward toward MO 904 are currently anticipated to begin mid to late next week. Procedural walkthrough for final dewatering was held on Monday, November 7, onshore at Pascagoula. Return to service for the Chandeleur 12" pipeline is anticipated to occur during the week of November 21. The anticipated return to service date is contingent on numerous factors, including successful completion of ongoing repairs, weather, and conditions related to the dewatering and stand-up pressure test. As the dewatering and stand-up operations progress, Shippers will be advised via this website when Chandeleur is prepared to accept nominations for flows on the 12" mainline.

Response:
Operators tying into Chandeleur's 12" mainline (Mobile 904 (ZAU-8011, 8012) and Main Pass 41B (D12-802,803)) should be preparing to receive instructions for the commencement of dewatering operations and stand-up test.

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Maintenance  10/31/2005 14:04 

Effective:
10/30/2005 18:30

End: 
None

Subject:
Chandeleur Pipe Line Unplanned Maintenance on the 12" Lateral in the Vicinity of MO 864 Update: Chandeleur has completed the unplanned maintenance on the 12" lateral in the vicinity of MO 864. The following receipt points are now eligible to return to service: DRN, Point Name, Point Code, Flow Direction * 134553 MOBILE 904-A ZAU-801 Rec * 80825 MOBILE 908-A ZAU-2914 Rec * 87989 MOBILE 952 KAU-0215,216 Rec. Chandeleur will return to normal scheduling for these receipts points. Shippers are reminded of the following restrictions on the system: Due to the isolation of the 12" and 16" sections of the pipeline, the following restrictions are still in place for the Chandeleur pipeline: * 32397 MAIN PASS 41-L Deliveries allowed only to TETCO @ MAIN PASS 41; no Coden or Pascagoula deliveries allowed * 184404 MAIN PASS 41-B Deliveries allowed only to TETCO @ MAIN PASS 41; no Coden or Pascagoula deliveries allowed * 134553 MOBILE 904-A Deliveries allowed only to CODEN; no other deliveries allowed * 80825 MOBILE 908-A Deliveries allowed only to CODEN; no other deliveries allowed * 387989 MOBILE 952 Deliveries allowed only to CODEN; no other deliveries allowed * 387994 MISS SOUND 73 Deliveries allowed only to CODEN; no other deliveries allowed * 134539 CHANDELEUR SOUND 32 Deliveries allowed only to Pascagoula; no other deliveries allowed * 377741 CHANDELEUR SOUND 35 Deliveries allowed only to Pascagoula; no other deliveries allowed * 441856 CHANDELEUR AREA 3 Deliveries allowed only to Pascagoula; no other deliveries allowed * 80823 MOBILE 990-A Deliveries allowed only to Pascagoula; no other deliveries allowed * 134516 GULF SOUTH BKHAUL Deliveries allowed only to Pascagoula; no other deliveries allowed. The following delivery points apply to those receipt points above restricted to Pascagoula only deliveries: * 12327 GULF SOUTH @ PASC ZAU-550D Del * 134537 CHEV USA PASC REFY ZAU-500 Del.

Response:
Shippers should confirm available supplies with their point operators before submitting nominations. Nominations will be processed, volumes confirmed and flows scheduled in accordance with the applicable provisions of Chandeleur's FERC tariff.

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Maintenance  10/21/2005 15:53 

Effective:
10/21/2005 15:53

End: 
None

Subject:
Chandeleur Pipe Line Unplanned Maintenance on the 12" Lateral in the Vicinity of MO 864 Update: Maintenance on the valve in the vicinity of MO 864 has been delayed due to the uncertainty of Hurricane Wilma and its effects on the Gulf of Mexico. The repair vessel has sought safe harbor, but plans are to resume repairs early next week.

Response:
Shippers are advised to continue to monitor the website for further updates.

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Other  10/21/2005 15:48 

Effective:
10/21/2005 15:48

End: 
None

Subject:
Chandeleur Pipe Line 12" Pipeline Repair Status Update: End connectors have been installed on the damaged section of the pipeline. All damaged 12" pipe has been removed from the right of way and loaded on the lay barge. New pipe has been loaded on the barge for delivery to the repair site. Repair activities are currently halted due to the uncertainty of Hurricane Wilma and its effects on the Gulf of Mexico. Initial procedures and contacts for the dewatering process is ongoing. The dewatering equipment is due to be assembled on site the week of October 24. Service on the 12" pipeline is currently anticipated to resume mid-November. The anticipated return to service date continues to be contingent on weather conditions in the Gulf and any other unexpected occurrences.

Response:
Shippers are advised to continue to monitor the website for further updates.

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Other  10/20/2005 18:18 

Effective:
10/20/2005 18:18

End: 
None

Subject:
During repair operations of the 12" Chandeleur mainline, Chandeleur personnel have discovered an anomaly in its 16" mainline. As a precautionary measure, Chandeleur is lowering its pipeline overpressure protection device settings to 755 psig. At this lower operating pressure, Chandeleur is no longer able to make deliveries into Destin Pipeline at Pascagoula, (DRN 294295; KAU-700). In accordance with Chandeleur's FERC Gas Tariff General Terms and Conditions Section 6.4, Chandeleur is providing notice that all deliveries (both FT & IT) into Destin are being reduced to EPSQ for gas day 10/20/2005 and will be further reduced to a scheduled volume of zero effective gas day 10/21/2005.

Response:
Interconnecting point operators on the 16" mainline should contact Chandeleur gas control at (281) 596-2810 to ensure non-interruption during this pressure reduction. Shippers nominating to this delivery point should tender nominations to alternate delivery points until further notice. Due to operating restrictions currently in place on the Chandeleur system as a result of the 12" mainline outage, shippers are encouraged to reference previous Critical Force Majeure notices for information regarding alternate delivery points which may be available to shippers on this segment of Chandeleur's system.

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Maintenance  10/17/2005 14:52 

Effective:
10/17/2005 14:52

End: 
None

Subject:
Subsequent to the resumption of flows through the 12" lateral extending between MO 904 and MO 908A, it has become necessary for Chandeleur to conduct unplanned maintenance on its lateral in the vicinity of MO 864. As a result, the following receipt points are shut in effective immediately: DRN, Point Name, Point Code, Flow Direction 134553 MOBILE 904-A ZAU-801 Rec 80825 MOBILE 908-A ZAU-2914 Rec 87989 MOBILE 952 KAU-0215,216 Rec Repairs will begin as soon as the necessary vessel(s) can be mobilized to the location. Repair schedule is contingent upon continued favorable weather in the Gulf. Nominations were reduced to EPSQ in Intraday 2 cycle for gas day October 16, 2005, and further reduced to zero for gas day October 17. Nominations will remain at zero for the above receipt points until maintenance is completed. Shippers will be notified via this website when maintenance is complete.

Response:
Shippers should monitor the website for additional information and be prepared to nominate once maintenance is complete.

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Force Majeure  10/14/2005 17:15 

Effective:
10/14/2005 09:00

End: 
None

Subject:
Force Majeure conditions have been lifted for the following points on the Chandeleur pipeline: DRN, Point Name, Point Code, Flow Direction *134553 MOBILE 904-A *ZAU-801 *Rec Volumes from this receipt point are eligible for nomination ONLY to 387991 GULF SOUTH MOBILE BAY @ CODEN (INCLUDING FGT 302231) and 387992 TRANSCO @ CODEN (INCLUDING FGT 157741). Volumes from this point are eligible for nominations effective gas day 10/14/2005; HOWEVER, all parties are notified that continued service from and to this receipt and these delivery points is contingent upon consistent gas quality readings. Should dew points increase or other quality issues arise, Chandeleur will respond as necessary in accordance with the applicable provisions of its tariff. Force Majeure continues in effect on Chandeleur's 12" mainline system as a result of Hurricane Katrina. Plans for the repair and dewatering of the 12" pipeline are in progress. Details will be posted as they become available. The following points remain eligible for nominations as previously announced: DRN, Point Name, Point Code, Flow Direction *32397 * MAIN PASS 41-L * D12-836,837 * Rec *184404 * MAIN PASS 41-B * D12-802,803 * Rec * 80825 * MOBILE 908-A * ZAU-2914 * Rec *387989 * MOBILE 952 * KAU-0215,216 * Rec * 387994 * MISS SOUND 73 * ZAU-8001,02 * Rec * 387991 * GULF SOUTH MOBILE BAY @ CODEN * ZAU-3586003 * Del * 387992 * TRANSCO @ CODEN * ZAU-356201,2 * Del * 124998 * TETCO @ MAIN PASS 41 * D12-836,837D* Del Note: Due to the isolation of the 12" and 16" sections of the pipeline, the following restrictions are still in place for the preceding points: *32397 * MAIN PASS 41-L *Deliveries allowed only to TETCO @ MAIN PASS 41; no Coden deliveries allowed * 184404 * MAIN PASS 41B *Deliveries allowed only to TETCO @ MAIN PASS 41; no Coden deliveries allowed *80825 * MOBILE 908-A *Deliveries allowed only to CODEN; no TETCO deliveries allowed * 387989 * MOBILE 952 *Deliveries allowed only to CODEN; no TETCO deliveries allowed * 387994 * MISS SOUND 73 *Deliveries allowed only to CODEN; no TETCO deliveries allowed *134539 * CHANDELEUR SOUND 32 *Deliveries allowed only to Pascagoula; no other deliveries allowed * 377741 * CHANDELEUR SOUND 35 *Deliveries allowed only to Pascagoula; no other deliveries allowed * 441856 * CHANDELEUR AREA 3 *Deliveries allowed only to Pascagoula; no other deliveries allowed * 80823 * MOBILE 990-A *Deliveries allowed only to Pascagoula; no other deliveries allowed * 134516 * GULF SOUTH BKHAUL *Deliveries allowed only to Pascagoula; no other deliveries allowed The following delivery points apply to those receipt points above restricted to Pascagoula deliveries: * 294295 * DESTIN PIPELINE @ PASC KAU-700 Del * 12327 * GULF SOUTH @ PASC ZAU-550D Del * 134537 * CHEV USA PASC REFY ZAU-500 Del

Response:
Shippers may tender nominations from eligible points. Nominations will be processed, volumes confirmed and flows scheduled in accordance with the applicable provisions of Chandeleur's tariff.

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Other  09/30/2005 13:44 

Effective:
09/30/2005 13:44

End: 
None

Subject:
Chandeleur Pipe Line has located the break in its 12" mainline. Chevron Pipe Line, as operator for Chandeleur Pipe Line, is currently preparing pipeline repair and dewatering procedures. As a reminder, all services at the following points remain unavailable and these points are being declared ineligible for return to service pending further assessment of the damage to the 12" mainline: DRN, Point Name, Point Code, Flow Direction: * 134553 MOBILE 904-A ZAU-801 R, * TETCO @ MAIN PASS BACKHAUL 12-836,837R, * 441563 TRANSCO @ CODEN BACKHAUL ZAU-356201,2 Rec.

Response:
All parties are urged to monitor this website for further information. Chandeleur will furnish system changes and operational updates as quickly as possible.

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Force Majeure  09/29/2005 13:38 

Effective:
09/29/2005 13:38

End: 
None

Subject:
Force Majeure conditions have been lifted for the following points: DRN, Point Name, Point Code, Flow Direction * 134539 CHANDELEUR SOUND 32 ZAU-700 R * 377741 CHANDELEUR SOUND 35 KAU-0230 R * 441856 CHANDELEUR AREA 3 ZAU-2800 R * 80823 MOBILE 990-A ZAU-900 R * 134516 GULF SOUTH BACKHAUL ZAU-550 R * 294295 DESTIN PIPELINE @ PASCAGOULA KAU-700 D * 12327 GULF SOUTH @ PASCAGOULA ZAU-550 D * 134537 CHEV. USA PASC. REFINERY ZAU-500 D* Volumes from these receipt points are eligible for nomination ONLY to *294295 DESTIN PIPELINE @ PASCAGOULA KAU-700 D * 12327 GULF SOUTH @ PASCAGOULA ZAU-550 D * 134537 CHEV. USA PASC. REFINERY ZAU-500 D*. Volumes from these points are eligible for nominations effective gas day 09/29/2005; HOWEVER, all parties are notified that continued service from and to these receipt and delivery points is contingent upon consistent gas quality readings. Should dew points increase or other quality issues arise, Chandeleur will respond as necessary in accordance with the applicable provisions of its tariff. Additionally, due to operational limits, the Destin delivery location could be subject to curtailment and will be made in accordance with Section 6.3 of the General Terms and Conditions of Chandeleur's FERC Gas Tariff. Force Majeure continues in effect on Chandeleur's 12" mainline system as a result of Hurricane Katrina. Detailed evaluation of the damaged 12" line is planned to start today. As a result, all services at the following points remain unavailable and these points are being declared ineligible for return to service pending further assessment of potential pipeline damage: DRN, Point Name, Point Code, Flow Direction * 134553 MOBILE 904-A ZAU-801 R * TETCO @ MAIN PASS BACKHAUL 12-836,837R * * 441563 TRANSCO @ CODEN BACKHAUL ZAU-356201,2 Rec * The following points remain eligible for nominations as previously announced: DRN, Point Name, Point Code, Flow Direction *32397 MAIN PASS 41-L D12-836,837 Rec * 184404 MAIN PASS 41-B D12-802,803 Rec * 80825 MOBILE 908-A ZAU-2914 Rec * 387989 MOBILE 952 KAU-0215,216 Rec * 387990 MOBILE 864 ZAU-0821A,B Rec * 387994 MISSISSIPPI SOUND 73 ZAU-8001,02 Rec * 387991 GULF SOUTH MOBILE BAY @ CODEN ZAU-3586003 Del * 387992 TRANSCO @ CODEN ZAU-35620 1,2 Del * 124998 TETCO @ MAIN PASS 41-L D12-836,837D Del Note: Due to the isolation of the 12" and 16" sections of the pipeline, the following restrictions are in place: * 32397 MAIN PASS 41-L Deliveries allowed only to TETCO @ MAIN PASS 41; no Coden deliveries allowed * 184404 MAIN PASS 41-B Deliveries allowed only to TETCO @ MAIN PASS 41; no Coden deliveries allowed * 80825 MOBILE 908-A Deliveries allowed only to CODEN; no TETCO deliveries allowed * 387989 MOBILE 952 Deliveries allowed only to CODEN; no TETCO deliveries allowed * 387994 MISS SOUND 73 Deliveries allowed only to CODEN; no TETCO deliveries allowed.

Response:
Shippers may tender nominations from eligible points. Nominations will be processed, volumes confirmed and flows scheduled in accordance with the applicable provisions of Chandeleur's tariff.

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Force Majeure  09/28/2005 18:01 

Effective:
09/28/2005 18:01

End: 
09/28/2005 09:00

Subject:
Force Majeure remains in effect on portions of the Chandeleur Pipe Line system as a result of Hurricanes Katrina and Rita. Approximately 10% of the system is in shallow water and remains to be surveyed by side scan. Data evaluation from the survey is ongoing. Testing and re-commissioning of the 16" mainline is currently being conducted. Detailed evaluation of the damaged 12" segment is planned to start 9/29.

Response:
The following points are eligible for nominations: DRN Point Name Point Code Flow Direction *32397 MAIN PASS 41-L D12-836,837 Rec * 184404 MAIN PASS 41-B D12-802,803 Rec * 80825 MOBILE 908-A ZAU-2914 Rec * 387989 MOBILE 952 KAU-0215,216 Rec * 387990 MOBILE 864 ZAU-0821A,B Rec * 387994 MISSISSIPPI SOUND 73 ZAU-8001,02 Rec * 387991 GULF SOUTH MOBILE BAY @ CODEN ZAU-3586003 Del * 387992 TRANSCO @ CODEN ZAU-35620 1,2 Del * 124998 TETCO @ MAIN PASS 41-L D12-836,837D Del Note: Due to the isolation of the 12" and 16" sections of the pipeline, the following restrictions are in place: * 32397 MAIN PASS 41-L Deliveries allowed only to TETCO @ MAIN PASS 41; no Coden deliveries allowed * 184404 MAIN PASS 41-B Deliveries allowed only to TETCO @ MAIN PASS 41; no Coden deliveries allowed * 80825 MOBILE 908-A Deliveries allowed only to CODEN; no TETCO deliveries allowed * 387989 MOBILE 952 Deliveries allowed only to CODEN; no TETCO deliveries allowed * 387994 MISS SOUND 73 Deliveries allowed only to CODEN; no TETCO deliveries allowed

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Other  09/21/2005 17:28 

Effective:
09/21/2005 17:00

End: 
None

Subject:
Chandeleur Pipe Line Company is carefully monitoring Hurricane Rita as it is expected to make landfall along the Texas coast sometime early Saturday morning, September 24, 2005. Chandeleur's offices will be closed Thursday and Friday, September 22 and 23. ALL PREVIOUS NOTICES REGARDING CHANDELEUR'S FORCE MAJEURE REMAIN IN FORCE. HURRICANE RITA HAS DELAYED FURTHER TESTING AND RECOMMISSIONING FOR THOSE LOCATIONS ALREADY DECLARED INELIGIBLE FOR RETURN TO SERVICE. HOWEVER, SEE RESPONSE BELOW FOR ELIGIBLE SHIPPERS.

Response:
Chandeleur is taking all steps to ensure safe operation of the pipeline. Shippers must ensure that any of the following locations declared eligible to return to service but were evacuated due to Hurricane Rita must contact Gas Control at (281) 596-2810 prior to start up. The Chandeleur Scheduler should also be contacted as noted below. DRN Point Name Point Code * 32397 MAIN PASS 41-L D12-836,837 * 184404 MAIN PASS 41-B D12-802,803 * 80825 MOBILE 908-A ZAU-2914 * 387989 MOBILE 952 KAU-0215,216 * 387994 MISS SOUND 73 ZAU-8001,02

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732. Since office phones, cell phones and pagers may not be reliable during this time, an additional Nextel phone has been acquired. That number is (281) 853-7811.

Other  09/21/2005 16:28 

Effective:
09/21/2005 16:28

End: 
None

Subject:
Force Majeure remains in effect on previously identified portions of the Chandeleur Pipe Line system as a result of Hurricane Katrina. Safety procedures effectuated in preparation for Hurricane Rita have necessitated the evacuation of work crews and caused a delay in further testing of Chandeleur's system or recommissioning of any additional segments of pipe. Consequently, portions of the Chandeleur system that lie in shallow water remain to be surveyed by side scan. Data evaluation from completed surveys is ongoing. Testing of the 12" line in Chandeleur Area 7 resulted in a small release which occurred as a result of testing. Chandeleur has successfully isolated its 16" segment to facilitate further testing in preparation for eventual recommissioning.

Response:
The following points are eligible for nominations: DRN Point Name Point Code Flow Direction *32397 MAIN PASS 41-L D12-836,837 Rec * 184404 MAIN PASS 41-B D12-802,803 Rec * 80825 MOBILE 908-A ZAU-2914 Rec * 387989 MOBILE 952 KAU-0215,216 Rec * 387990 MOBILE 864 ZAU-0821A,B Rec * 387994 MISSISSIPPI SOUND 73 ZAU-8001,02 Rec * 387991 GULF SOUTH MOBILE BAY @ CODEN ZAU-3586003 Del * 387992 TRANSCO @ CODEN ZAU-35620 1,2 Del * 124998 TETCO @ MAIN PASS 41-L D12-836,837D Del Note: Due to the isolation of the 12" and 16" sections of the pipeline, the following restrictions are in place: * 32397 MAIN PASS 41-L Deliveries allowed only to TETCO @ MAIN PASS 41; no Coden deliveries allowed * 184404 MAIN PASS 41-B Deliveries allowed only to TETCO @ MAIN PASS 41; no Coden deliveries allowed * 80825 MOBILE 908-A Deliveries allowed only to CODEN; no TETCO deliveries allowed * 387989 MOBILE 952 Deliveries allowed only to CODEN; no TETCO deliveries allowed * 387994 MISS SOUND 73 Deliveries allowed only to CODEN; no TETCO deliveries allowed

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Other  09/19/2005 15:46 

Effective:
09/19/2005 15:46

End: 
None

Subject:
Force Majeure remains in effect on portions of the Chandeleur Pipe Line system as a result of Hurricane Katrina. Low pressure testing of the isolated 16" segment was conducted and the line is maintaining this pressure. During low pressure testing of the segregated 12", a loss of pressure indicated a problem in the Chandeleur Area Block 7. Additional isolation is needed to prepare the 16" segment for additional testing and resumption of service. A side scan sonar survey of the 12" and 16" lines is currently 90% complete. Approximately 10% of the system is in shallow water and remains to be surveyed. Data evaluation from the survey is ongoing and will need to be completed prior to returning the 16" and 12" segments to service. As a result, all services at the following points remain unavailable and these points are being declared ineligible for return to service pending further assessment of potential pipeline damage: DRN Point Name Point Code Flow Direction * 134553 MOBILE 904-A ZAU-801 R * TETCO @ MAIN PASS BACKHAUL 12-836,837R * 134539 CHANDELEUR SOUND 32 ZAU-700 R * 377741 CHANDELEUR SOUND 35 KAU-0230 R * 441856 CHANDELEUR AREA 3 ZAU-2800 R * 80823 MOBILE 990-A ZAU-900 R * 134516 GULF SOUTH BACKHAUL ZAU-550 R * 294295 DESTIN PIPELINE @ PASCAGOULA KAU-700 D * 12327 GULF SOUTH @ PASCAGOULA ZAU-550 D * 134537 CHEV. USA PASC. REFINERY ZAU-500 D * 441563 TRANSCO @ CODEN BACKHAUL ZAU-356201,2 Rec * The following points are eligible for nominations: DRN Point Name Point Code Flow Direction *32397 MAIN PASS 41-L D12-836,837 Rec * 184404 MAIN PASS 41-B D12-802,803 Rec * 80825 MOBILE 908-A ZAU-2914 Rec * 387989 MOBILE 952 KAU-0215,216 Rec * 387990 MOBILE 864 ZAU-0821A,B Rec * 387994 MISSISSIPPI SOUND 73 ZAU-8001,02 Rec * 387991 GULF SOUTH MOBILE BAY @ CODEN ZAU-3586003 Del * 387992 TRANSCO @ CODEN ZAU-35620 1,2 Del * 124998 TETCO @ MAIN PASS 41-L D12-836,837D Del Note: Due to the isolation of the 12" and 16" sections of the pipeline, the following restrictions are in place: * 32397 MAIN PASS 41-L Deliveries allowed only to TETCO @ MAIN PASS 41; no Coden deliveries allowed * 184404 MAIN PASS 41-B Deliveries allowed only to TETCO @ MAIN PASS 41; no Coden deliveries allowed * 80825 MOBILE 908-A Deliveries allowed only to CODEN; no TETCO deliveries allowed * 387989 MOBILE 952 Deliveries allowed only to CODEN; no TETCO deliveries allowed * 387994 MISS SOUND 73 Deliveries allowed only to CODEN; no TETCO deliveries allowed

Response:
Shippers may tender nominations from eligible points. Nominations will be processed, volumes confirmed and flows scheduled in accordance with the applicable provisions of Chandeleur's tariff.

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Other  09/16/2005 12:57 

Effective:
09/16/2005 12:57

End: 
None

Subject:
Force Majeure remains in effect on portions of the Chandeleur Pipe Line system as a result of Hurricane Katrina. Instrumentation indicates that the Chandeleur system has experienced a loss of pressure on its 12" and 16" lines extending between the Main Pass area and onshore, Pascagoula. Chandeleur continues conducting a side scan sonar survey of its 12" and 16" lines and is currently 90% complete. Approximately 10% of the system is in shallow water and remains to be surveyed. Data evaluation from the survey is ongoing. Plans are in place to isolate the 12" and 16" sections of the system and conduct testing to help identify problems. As a result, all services at the following points remain unavailable and these points are being declared ineligible for return to service pending further assessment of potential pipeline damage: DRN Point Name Point Code Flow Direction * 134553 MOBILE 904-A ZAU-801 R * TETCO @ MAIN PASS BACKHAUL 12-836,837R * 134539 CHANDELEUR SOUND 32 ZAU-700 R * 377741 CHANDELEUR SOUND 35 KAU-0230 R * 441856 CHANDELEUR AREA 3 ZAU-2800 R * 80823 MOBILE 990-A ZAU-900 R * 134516 GULF SOUTH BACKHAUL ZAU-550 R * 294295 DESTIN PIPELINE @ PASCAGOULA KAU-700 D * 12327 GULF SOUTH @ PASCAGOULA ZAU-550 D * 134537 CHEV. USA PASC. REFINERY ZAU-500 D * 441563 TRANSCO @ CODEN BACKHAUL ZAU-356201,2 Rec * The following points are eligible for nominations: DRN Point Name Point Code Flow Direction *32397 MAIN PASS 41-L D12-836,837 Rec * 184404 MAIN PASS 41-B D12-802,803 Rec * 80825 MOBILE 908-A ZAU-2914 Rec * 387989 MOBILE 952 KAU-0215,216 Rec * 387990 MOBILE 864 ZAU-0821A,B Rec * 387994 MISSISSIPPI SOUND 73 ZAU-8001,02 Rec * 387991 GULF SOUTH MOBILE BAY @ CODEN ZAU-3586003 Del * 387992 TRANSCO @ CODEN ZAU-35620 1,2 Del * 124998 TETCO @ MAIN PASS 41-L D12-836,837D Del

Response:
Shippers may tender nominations from eligible points. Nominations will be processed, volumes confirmed and flows scheduled in accordance with the applicable provisions of Chandeleur's tariff.

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Other  09/14/2005 09:32 

Effective:
09/14/2005 09:35

End: 
None

Subject:
Force Majeure remains in effect on portions of the Chandeleur Pipe Line system as a result of Hurricane Katrina. Instrumentation indicates that the Chandeleur system has experienced a loss of pressure on its 12" and 16" lines extending between the Main Pass area and onshore, Pascagoula. Chandeleur is conducting a side scan sonar survey of its 12" and 16" lines and is currently 70% complete. After further evaluation of the side scan survey results in the vicinity of Chandeleur Area Block 7, the collapsed depression has been reclassified "exposed pipe". Chandeleur continues simultaneous damage assessment operations both onshore at Pascagoula, MS and offshore on the 12" and 16" pipelines. As a result, all services at the following points remain unavailable and these points are being declared ineligible for return to service pending further assessment of potential pipeline damage: DRN Point Name Point Code Flow Direction * 134553 MOBILE 904-A ZAU-801 R * TETCO @ MAIN PASS BACKHAUL 12-836,837R * 134539 CHANDELEUR SOUND 32 ZAU-700 R * 377741 CHANDELEUR SOUND 35 KAU-0230 R * 441856 CHANDELEUR AREA 3 ZAU-2800 R * 80823 MOBILE 990-A ZAU-900 R * 134516 GULF SOUTH BACKHAUL ZAU-550 R * 294295 DESTIN PIPELINE @ PASCAGOULA KAU-700 D * 12327 GULF SOUTH @ PASCAGOULA ZAU-550 D * 134537 CHEV. USA PASC. REFINERY ZAU-500 D * 441563 TRANSCO @ CODEN BACKHAUL ZAU-356201,2 Rec * The following points are eligible for nominations: DRN Point Name Point Code Flow Direction *32397 MAIN PASS 41-L D12-836,837 Rec * 184404 MAIN PASS 41-B D12-802,803 Rec * 80825 MOBILE 908-A ZAU-2914 Rec * 387989 MOBILE 952 KAU-0215,216 Rec * 387990 MOBILE 864 ZAU-0821A,B Rec * 387994 MISSISSIPPI SOUND 73 ZAU-8001,02 Rec * 387991 GULF SOUTH MOBILE BAY @ CODEN ZAU-3586003 Del * 387992 TRANSCO @ CODEN ZAU-35620 1,2 Del * 124998 TETCO @ MAIN PASS 41-L D12-836,837D Del

Response:
Shippers may tender nominations from eligible points. Nominations will be processed, volumes confirmed and flows scheduled in accordance with the applicable provisions of Chandeleur's tariff.

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Other  09/13/2005 13:42 

Effective:
09/13/2005 13:45

End: 
None

Subject:
Prior notice regarding lifting of Force Majeure at 134553 MOBILE 904-A ZAU-801 R was premature. Chandeleur apologizes for any inconvenience this may have caused.

Response:
Disregard previous notice. The notice has been retracted.

Contact:
Sharon Savage Title: Volumetric Analyst E-Mail: savage@chevron.com Phone: (281) 596-2147 Fax: (281) 596-2855

Force Majeure  09/13/2005 13:39 

Effective:
09/13/2005 13:40

End: 
None

Subject:
Force Majeure conditions have been lifted for the following points: *32397 MAIN PASS 41-L D12-836,837 Rec *184404 MAIN PASS 41-B D12-802,803 Rec *124998 TETCO @ MAIN PASS 41-L D12-836,837D Del. Volumes from these receipt points are eligible for nomination ONLY to 124998 TETCO @ MAIN PASS 41-L D12-836,837D Del. Force Majeure continues in effect on the remaining portions the Chandeleur mainline system as a result of Hurricane Katrina. Instrumentation indicates that the Chandeleur mainlines extending between the Main Pass area and onshore, Pascagoula have experienced a loss of pressure. Chandeleur is conducting a side scan sonar survey of its 12" and 16" lines. 24 miles of survey have been completed for both pipelines. A collapsed depression in the vicinity of Chandeleur Area Block 7 was noted on September 11, 2005. Chandeleur continues simultaneous damage assessment operations both onshore at Pascagoula, MS and offshore on the 12" and 16" pipelines. As a result, all services at the following points remain unavailable and these points are being declared ineligible for return to service pending further assessment of potential pipeline damage: DRN Point Name Point Code Flow Direction * 134553 MOBILE 904-A ZAU-801 R * TETCO @ MAIN PASS BACKHAUL 12-836,837R * 134539 CHANDELEUR SOUND 32 ZAU-700 R * 377741 CHANDELEUR SOUND 35 KAU-0230 R * 441856 CHANDELEUR AREA 3 ZAU-2800 R * 80823 MOBILE 990-A ZAU-900 R * 134516 GULF SOUTH BACKHAUL ZAU-550 R * 294295 DESTIN PIPELINE @ PASCAGOULA KAU-700 D * 12327 GULF SOUTH @ PASCAGOULA ZAU-550 D * 134537 CHEV. USA PASC. REFINERY ZAU-500 D * 441563 TRANSCO @ CODEN BACKHAUL ZAU-356201,2 Rec * The following points are eligible for nominations: DRN Point Name Point Code Flow Direction *32397 MAIN PASS 41-L D12-836,837 Rec * 184404 MAIN PASS 41-B D12-802,803 Rec * 80825 MOBILE 908-A ZAU-2914 Rec * 387989 MOBILE 952 KAU-0215,216 Rec * 387990 MOBILE 864 ZAU-0821A,B Rec * 387994 MISSISSIPPI SOUND 73 ZAU-8001,02 Rec * 387991 GULF SOUTH MOBILE BAY @ CODEN ZAU-3586003 Del * 387992 TRANSCO @ CODEN ZAU-35620 1,2 Del * 124998 TETCO @ MAIN PASS 41-L D12-836,837D Del

Response:
Shippers may tender nominations from eligible points. Nominations will be processed, volumes confirmed and flows scheduled in accordance with the applicable provisions of Chandeleur's tariff.

Contact:
Sharon Savage Title: Volumetric Analyst E-Mail: savage@chevron.com Phone: (281) 596-2147 Fax: (281) 596-2855

Other  09/12/2005 09:17 

Effective:
09/12/2005 09:20

End: 
None

Subject:
Force Majeure remains in effect on portions of the Chandeleur Pipe Line system as a result of Hurricane Katrina. Instrumentation indicates that the Chandeleur system has experienced a loss of pressure on its 12" and 16" lines extending between the Main Pass area and onshore, Pascagoula. Chandeleur has begun conducting a side scan sonar survey of its 12" and 16" lines and weather conditions allowed 24 miles of survey to be completed for both pipelines. A collapsed depression in the vicinity of Chandeleur Area Block 7 was noted on September 11, 2005. Chandeleur continues simultaneous damage assessment operations both onshore at Pascagoula, MS and offshore on the 12" and 16" pipelines. As a result, all services at the following points remain unavailable and these points are being declared ineligible for return to service pending further assessment of potential pipeline damage: DRN Point Name Point Code Flow Direction * TETCO @ MAIN PASS BACKHAUL 12-836,837R * 134539 CHANDELEUR SOUND 32 ZAU-700 R * 377741 CHANDELEUR SOUND 35 KAU-0230 R * 441856 CHANDELEUR AREA 3 ZAU-2800 R * 80823 MOBILE 990-A ZAU-900 R * 134553 MOBILE 904-A ZAU-801 R * 134516 GULF SOUTH BACKHAUL ZAU-550 R * 294295 DESTIN PIPELINE @ PASCAGOULA KAU-700 D * 12327 GULF SOUTH @ PASCAGOULA ZAU-550 D * 134537 CHEV. USA PASC. REFINERY ZAU-500 D * 441563 TRANSCO @ CODEN BACKHAUL ZAU-356201,2 Rec * The following points are eligible for nominations: Chandeleur will make every effort to reestablish flow from the following points once nominations are confirmed with upstream and downstream parties and volumes are scheduled. DRN Point Name Point Code Flow Direction 32397 MAIN PASS 41-L D12-836,837 Rec * 184404 MAIN PASS 41-B D12-802,803 Rec * 80825 MOBILE 908-A ZAU-2914 Rec * 387989 MOBILE 952 KAU-0215,216 Rec * 387990 MOBILE 864 ZAU-0821A,B Rec * 387994 MISSISSIPPI SOUND 73 ZAU-8001,02 Rec * 387991 GULF SOUTH MOBILE BAY @ CODEN ZAU-3586003 Del * 387992 TRANSCO @ CODEN ZAU-356201,2 Del * 124998 TETCO @ MAIN PASS 41-L D12-836,837D Del

Response:
Shippers and interested parties are urged to remain in contact with Chandeleur's Customer Service group prior to initiating flows into the system.

Contact:
Name: Sharon Savage Title: Volumetric Analyst E-Mail: savage@chevron.com Phone: (281) 596-2147 Fax: (281) 596-2855

Other  09/07/2005 10:45 

Effective:
09/07/2005 10:45

End: 
09/07/2005 10:45

Subject:
Force Majeure remains in effect on some portion(s) of the Chandeleur Pipe Line system as a result of Hurricane Katrina. Instrumentation indicates that the Chandeleur system has experienced a loss of pressure on its 12" and 16" lines extending between the Main Pass area and onshore, Pascagoula, leading pipeline personnel to believe that the integrity of a portion of the system has been breeched. Consequently, Chandeleur has begun efforts to conduct a side scan sonar survey of its 12" and 16" lines. Weather conditions, however, have caused an unanticipated delay in this assessment. As a result, all services at the following points remain unavailable and these points have been declared ineligible for return to service pending further assessment of potential pipeline damage: DRN Point Name Point Code Flow Direction * TETCO @ MAIN PASS BACKHAUL 12-836,837R * 134539 CHANDELEUR SOUND 32 ZAU-700 R * 377741 CHANDELEUR SOUND 35 KAU-0230 R * 441856 CHANDELEUR AREA 3 ZAU-2800 R * 80823 MOBILE 990-A ZAU-900 R * 134553 MOBILE 904-A ZAU-801 R * 134516 GULF SOUTH BACKHAUL ZAU-550 R * 294295 DESTIN PIPELINE @ PASCAGOULA KAU-700 D * 12327 GULF SOUTH @ PASCAGOULA ZAU-550 D * 134537 CHEV. USA PASC. REFINERY ZAU-500 D * 441563 TRANSCO @ CODEN BACKHAUL ZAU-356201,2 Rec * Chandeleur is currently allowing injections into its 12" lateral delivering to Coden from Mobile 908 northward. The stand-up test has been completed on the Coden lateral. Chandeleur is accepting nominations at Main Pass 41 to Chandeleur's sub-sea interconnect with Texas Eastern. Consequently, the following points are eligible for nominations: DRN Point Name Point Code Flow Direction 32397 MAIN PASS 41-L D12-836,837 Rec * 184404 MAIN PASS 41-B D12-802,803 Rec * 80825 MOBILE 908-A ZAU-2914 Rec * 387989 MOBILE 952 KAU-0215,216 Rec * 387994 MISSISSIPPI SOUND 73 ZAU-8001,02 Rec * 387991 GULF SOUTH MOBILE BAY @ CODEN ZAU-3586003 Del * 387992 TRANSCO @ CODEN ZAU-356201,2 Del * 124998 TETCO @ MAIN PASS 41-L D12-836,837D Del Chandeleur will make every effort to initiate flow at these points once nominations are confirmed with upstream and downstream parties and volumes are scheduled. Shippers, however, are urged to continue to monitor the website. In the event that conditions change, appropriate notices will be posted.

Response:
All parties are urged to monitor this website for further information. Chandeleur will furnish system changes and operational updates as quickly as possible.

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Force Majeure  09/03/2005 13:00 

Effective:
09/03/2005 12:00

End: 
None

Subject:
Force Majeure has been lifted for Main Pass 41-L and 41-B receipt points and for TETCO delivery point. Force Majeure remains in effect on other portion(s) of the Chandeleur Pipe Line system as a result of Hurricane Katrina. Instrumentation indicates that the Chandeleur system has experienced a loss of pressure on its 12" and 16" lines extending between the Main Pass area and onshore, Pascagoula, leading pipeline personnel to believe that the integrity of a portion of the system has been breeched. As a result, all services at the following points remain unavailable and these points are being declared ineligible for return to service pending further assessment of potential pipeline damage: DRN Point Name Point Code Flow Direction * TETCO @ MAIN PASS BACKHAUL 12-836,837R * 134539 CHANDELEUR SOUND 32 ZAU-700 R * 377741 CHANDELEUR SOUND 35 KAU-0230 R * 441856 CHANDELEUR AREA 3 ZAU-2800 R * 80823 MOBILE 990-A ZAU-900 R * 134553 MOBILE 904-A ZAU-801 R * 134516 GULF SOUTH BACKHAUL ZAU-550 R * 294295 DESTIN PIPELINE @ PASCAGOULA KAU-700 D * 12327 GULF SOUTH @ PASCAGOULA ZAU-550 D * 134537 CHEV. USA PASC. REFINERY ZAU-500 D * 441563 TRANSCO @ CODEN BACKHAUL ZAU-356201,2 Rec * The following points are eligible for nominations: Chandeleur will make every effort to reestablish flow from the following points once nominations are confirmed with upstream and downstream parties and volumes are scheduled. Shippers, however, are urged to continue to monitor the website. In the unlikely event that Chandeleur will be required to implement Force Majeure at additional points, appropriate notices will be posted. DRN Point Name Point Code Flow Direction 32397 MAIN PASS 41-L D12-836,837 Rec * 184404 MAIN PASS 41-B D12-802,803 Rec * 80825 MOBILE 908-A ZAU-2914 Rec * 387989 MOBILE 952 KAU-0215,216 Rec * 387990 MOBILE 864 ZAU-0821A,B Rec * 387994 MISSISSIPPI SOUND 73 ZAU-8001,02 Rec * 387991 GULF SOUTH MOBILE BAY @ CODEN ZAU-3586003 Del * 387992 TRANSCO @ CODEN ZAU-356201,2 Del * 124998 TETCO @ MAIN PASS 41-L D12-836,837D Del

Response:
All parties are urged to monitor this website for further information. Chandeleur will furnish system changes and operational updates as quickly as possible. Operators are requested to remain in contact with Chandeleur's gas scheduler at (281) 596-2833 in order to assist Chandeleur in its evaluation of the status of production resources and assist the pipeline as required in evaluation of system integrity. Shippers desiring to nominate flow from eligible points are advised to validate proposed nomination data with production facilities, downstream entities and interconnecting downstream pipelines prior to making nominations. Many entities have incurred facility damage or continue to suffer communications failures, and are thus unwilling to accept deliveries.

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Force Majeure  08/31/2005 09:15 

Effective:
08/31/2005 09:00

End: 
None

Subject:
Chandeleur Pipe Line is declaring Force Majeure as a result of Hurricane Katrina. All services at all points remain curtailed through gas day August 31. Instrumentation indicates that the Chandeleur system has experienced a loss of pressure on its 12" and 16" lines extending between the Main Pass area and onshore, Pascagoula, leading pipeline personnel to believe that the integrity of the system has been breeched. As a result, all services at the following points remain curtailed into September and these points are being declared ineligible for return to service pending further assessment of potential pipeline damage: DRN Point Name Point Code Flow Direction Design Capacity 134533 TETCO @ MAIN PASS BACKHAUL 12-836,837R Rec 0 32397 MAIN PASS 41-L D12-836,837 Rec 15000 184404 MAIN PASS 41-B D12-802,803 Rec 60000 134539 CHANDELEUR SOUND 32 ZAU-700 Rec 20000 377741 CHANDELEUR SOUND 35 KAU-0230 Rec 60000 441856 CHANDELEUR AREA 3 ZAU-2800 Rec 20000 80823 MOBILE 990-A ZAU-900 Rec 80000 134553 MOBILE 904-A ZAU-8011,12 REC 45000 134516 GULF SOUTH BACKHAUL ZAU-550R Rec 0 124998 TETCO @ MAIN PASS 41-L D12-836,837D Del 75000 294295 DESTIN PIPELINE @ PASCAGOULA KAU-700 Del 34000 12327 GULF SOUTH @ PASCAGOULA ZAU-550D Del 95000 134537 CHEV. USA PASC. REFINERY ZAU-500 Del 52000

Response:
All parties are urged to monitor this website for further information. Chandeleur will furnish updates as quickly as possible. Operators are requested to contact Chandeleur's gas scheduler at (281) 596-2833 ASAP in order to assist Chandeleur in its evaluation of the status of production resources prior to September nominations. Shippers desiring to nominate for first of month (September) flow from the following points are advised to validate proposed nomination data with their production facilities, downstream entities and interconnecting downstream pipelines prior to making nominations. Chandeleur will make every effort to reestablish flow from these points once nominations are confirmed with upstream and downstream parties and volumes are scheduled. Shippers, however are urged to continue to monitor the website. In the unlikely event that Chandeleur will be required to implement Force Majeure at additional points, appropriate notices will be posted. DRN Point Name Point Code Flow Direction Design Capacity Scheduled Volume Available Capacity 80825 MOBILE 908-A ZAU-2914 Rec 13000 0 13000 387989 MOBILE 952 KAU-0215,216 Rec 32000 0 32000 387990 MOBILE 864 ZAU-0821A,B Rec 4000 0 4000 387994 MISSISSIPPI SOUND 73 ZAU-8001,02 Rec 2000 0 2000 441563 TRANSCO @ CODEN BACKHAUL ZAU-356201,2 Rec 35000 0 35000 387991 GULF SOUTH MOBILE BAY @ CODEN ZAU-3586003 Del 40000 0 40000 387992 TRANSCO @ CODEN ZAU-356201,2 Del 35000 0 35000

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Other  08/30/2005 16:32 

Effective:
08/30/2005 16:32

End: 
08/31/2005 16:00

Subject:
Early assessments of possible damage to Chandeleur Pipe Line subsequent to Hurricane Katrina have proved to be inconclusive. Reconnaissance flights are again scheduled for Wednesday. As soon as pipeline and platform conditions are verified, Chandeleur will make relevant information available to shippers via its website. Until such time as Chandeleur has verified the integrity of its system, all deliveries remain curtailed.

Response:
Shippers are advised to stay in contact with their production facilities and downstream parties prior to tendering nominations as well as to verify that interconnecting downstream pipelines are fully operational. Operators are requested to contact Chandeleur's gas scheduler at (281) 596-2833 ASAP in order to assist Chandeleur in its evaluation of the status of production resources prior to September nominations.

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Other  08/29/2005 16:51 

Effective:
08/29/2005 16:00

End: 
08/30/2005 17:00

Subject:
Status of Chandeleur Pipe Line subsequent to Hurricane Katrina -- We are currently in the process of assessing any possible damage to the pipeline as a result of Hurricane Katrina. Reconnaissance flights are scheduled for some facilities early Tuesday morning. As conditions are verified, Chandeleur will make relevant information available to shippers via its website. Until such time as Chandeleur has verified the integrity of its system, all deliveries remain curtailed.

Response:
Shippers are advised to stay in contact with their production facilities and downstream parties prior to tendering nominations. Operators are reminded to contact Chandeleur's gas control at (281) 596-2810 upon return to the production facilities and prior to bringing any production back on line.

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Curtailment  08/26/2005 17:35 

Effective:
08/27/2005 09:00

End: 
08/30/2005 09:00

Subject:
HURRICANE KATRINA UPDATE - Due to operational considerations on the pipeline related to the pending storm in the Gulf, shippers are reminded that all delivery points are subject to curtailment as needed and will be made in accordance with Section 6.3 of the General Terms and Conditions of Chandeleur's FERC Gas Tariff.

Response:
Shippers should be prepared to nominate alternate delivery points in the event of curtailment at any delivery point.

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Curtailment  07/05/2005 13:08 

Effective:
07/05/2005 17:00

End: 
07/07/2005 09:00

Subject:
TROPICAL STORM CINDY UPDATE - Due to operational considerations on the pipeline related to the pending storm in the Gulf, shippers are reminded that all delivery points are subject to curtailment as needed and will be made in accordance with Section 6.3 of the General Terms and Conditions of Chandeleur's FERC Gas Tariff.

Response:
Shippers should be prepared to nominate alternate delivery points in the event of curtailment at any delivery point.

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Capacity Constraint  07/05/2005 12:48 

Effective:
07/05/2005 17:00

End: 
07/07/2005 09:00

Subject:
TROPICAL STORM CINDY UPDATE - Due to operational considerations on the pipeline related to the pending storm in the Gulf, for gas day July 5, 2005, Intraday 2 cycle, and gas day July 6, 2005, Chandeleur Pipe Line will not accept increases in nominations at the following delivery points: Gulf South Mobile Bay - DRN 387991 (includes FGT deliveries) and Transco at Coden - DRN 387992 (includes FGT deliveries)

Response:
Capacity remains available at other delivery points on the Chandeleur system (Texas Eastern, Gulf South Pascagoula, Destin).

Contact:
Please contact Robbie Perry at (281) 596-2833 or Pager (800) 533-1732 if you have any questions.

Capacity Discounttest ** No Notices for this type
Intraday Bumptest ** No Notices for this type
Operational Flow Ordertest ** No Notices for this type
Phone Listtest ** No Notices for this type
Press Release, Company Newstest ** No Notices for this type